Clark County Reviews Plans for New Silverado Hotel-Casino on Las Vegas Boulevard
Devon Butler · Aug 27, 2026

Clark County Reviews Plans for New Silverado Hotel-Casino on Las Vegas Boulevard

Local Nevada developer Michael William Ochoa of Ochoa Development Corporation has submitted plans to Clark County for a two-phase hotel-casino resort called Silverado on a 13.5-acre vacant parcel at the intersection of Las Vegas Boulevard and Richmar Avenue, roughly five miles south of the Las Vegas Strip, and the filing includes detailed site layouts along with requests for zoning adjustments that will come before the Clark County Zoning Commission on September 2, 2026. Phase one centers on a 300-room hotel tower paired with a 57,000-square-foot casino floor plus restaurants, entertainment venues, and structured parking, while the overall project outlines an eventual build-out to 450 rooms across both phases on the same parcel.
Location and Site Characteristics
The chosen site sits along the southern stretch of Las Vegas Boulevard where traffic patterns and surrounding commercial development already support visitor activity, and county records show the land has remained undeveloped for several years prior to this application. Observers note that the location places the proposed resort several miles from the main concentration of major Strip properties yet still within the primary Las Vegas tourism corridor, which allows direct access from the boulevard without requiring new road infrastructure. Project documents list standard setbacks, drainage requirements, and landscaping standards that align with existing Clark County codes for similar hospitality uses in the area.
Project Components and Phasing
According to the submitted materials, phase one encompasses the core gaming and lodging elements with the 300-room tower, the full casino square footage, multiple dining outlets, and dedicated entertainment space, while phase two would add the remaining 150 rooms and any additional amenities needed to reach the total 450-room count. Parking facilities are described as multi-level structures designed to accommodate both hotel guests and casino patrons, and the plans also include provisions for pedestrian access points that connect to the surrounding sidewalk network along Las Vegas Boulevard. County staff have scheduled the zoning commission hearing for September 2, 2026, where commissioners will evaluate requests for permits, design review approvals, and any necessary waivers tied to the proposed layout.

Developer Experience and Regulatory Path
Michael William Ochoa and Ochoa Development Corporation have operated primarily in residential and commercial real estate sectors within Nevada, and the current filing marks the first time the firm has submitted plans for a casino gaming facility. The application package contains standard environmental assessments, traffic studies, and fiscal impact projections required by Clark County for large-scale hospitality projects, and those documents will be reviewed by multiple county departments before the September hearing date. Because the developer lacks prior casino operating experience, the zoning process will also examine compliance with Nevada Gaming Control Board licensing prerequisites that must be met separately from local land-use approvals.
Surrounding Property Context
The proposed location lies near the South Point Hotel Casino & Spa, which is owned by Michael Gaughan, and project opponents may raise concerns about market saturation and competitive effects during the public comment period at the zoning commission meeting. County procedures allow adjacent property owners to submit written statements or appear at the hearing to address potential impacts on traffic, noise, or economic conditions, and those comments become part of the official record considered by commissioners. The 13.5-acre parcel boundaries do not overlap with any existing gaming facilities, yet its proximity places the application within the same regional market that South Point currently serves.
Next Steps in Approval Process
Following the September 2, 2026 zoning commission session, any approved plans would advance to additional county reviews that cover building permits, health department clearances, and fire safety inspections before construction could begin. The two-phase approach allows the developer to complete the initial 300-room tower and casino operations first, then pursue the second phase once market conditions and financing align with the overall 450-room target. All filings remain available for public inspection through Clark County planning department channels, and any modifications to the original submission would require further commission consideration.
Conclusion
The Silverado proposal represents a new entry into the southern Las Vegas gaming corridor through standard county zoning channels, and the September 2, 2026 hearing will determine whether the project proceeds to the next regulatory stages. Details in the application cover the full scope of phase one construction plus the framework for later expansion, while the absence of prior casino experience by the developer introduces an additional layer of licensing review by state gaming authorities. County records continue to track the application as it moves through the established approval sequence.